Neart na Gaoithe OWF installation record

The NNG Offshore Wind Farm

The EDF Renewables ‘Strength Of The Wind’ Project, has the potential to generate 450w of renewable energy.

That’s enough power to generate electricity for over 375,000 Scottish households

Neart na Gaoithe (NnG) will offset an estimated 4000,000 tonnes of CO2 emissions each year 

The NnG Foundation Cable and Pile Installation:
  • Will Operate at 15.5km from the coast of Fife Ness and 16km from the Isle of May covering approx 105km2
  • Consists of 54 8MW Wind Turbine Generators and 2 Offshore Transformer Modules.
  • These will connect with the mainland at Thorntonloch Beach, East Lothian 

Installation Record

SAR ID NNG-A15

Pile 1

Pile 2

Pile 3

Actual Easting

541841.92

541815.88

541841.78

Actual Northing

6235004.87

6234990.00

6234974.87

Casing stick-up above seabed (m)

1.92

1.60

1.83

Date Casing Installed

02/09/20

17/08/20

01/09/20

Pile stick-up above seabed (m)

5.05

3.74

3.88

Date Pile Installed

23/08/2022

23/08/2022

23/08/2022

SAR ID NNG-F01

Pile 1

Pile 2

Pile 3

Actual Easting

551782.91

551756.66

551782.33

Actual Northing

6230133.89

6230119.40

6230103.89

Casing stick-up above seabed (m)

1.22

1.11

1.01

Date Casing Installed

08/09/20

11/09/20

07/09/20

Pile stick-up above seabed (m)

4.48

3.48

3.24

Date Pile Installed

14/05/2023

14/05/2023

14/05/2023

SAR ID NNG-B07

Pile 1

Pile 2

Pile 3

Actual Easting

545658.28

545632.74

545659.12

Actual Northing

6231742.51

6231726.81

6231712.51

Casing stick-up above seabed (m)

1.26

1.29

1.21

Date Casing Installed

17/09/20

16/09/20

18/09/20

Pile stick-up above seabed (m)

4.09

3.18

3.05

Date Pile Installed

10/06/22

10/06/22

10/06/22

SAR ID NNG-D15

Pile 1

Pile 2

Pile 3

Actual Easting

545090.14

545064.24

545090.29

Actual Northing

6236710.67

6236695.53

6236680.63

Casing stick-up above seabed (m)

1.24

1.44

1.48

Date Casing Installed

20/09/20

21/0920

19/09/20

Pile stick-up above seabed (m)

4.41

3.45

3.51

Date Pile Installed

27/03/22

26/03/22

26/03/22

SAR ID NNG-A06

Pile 1

Pile 2

Pile 3

Actual Easting

544703.65

544677.72

544703.73

Actual Northing

6230903.81

6230888.75

6230873.80

Casing stick-up above seabed (m)

1.90

1.82

2.07

Date Casing Installed

29/09/20

24/09/20

01/10/20

Pile stick-up above seabed (m)

5.54

4.55

4.76

Date Pile Installed

14/04/22

14/04/22

14/04/22

SAR ID NNG-D22

Pile 1

Pile 2

Pile 3

Actual Easting

543184.59

543158.65

543184.65

Actual Northing

6239939.84

6239924.79

6239909.83

Casing stick-up above seabed (m)

0.57

0.20

0.35

Date Casing Installed

08/10/20

12/10/20

10/10/20

Pile stick-up above seabed (m)

2.721

1.254

1.455

Date Pile Installed

18/08/21

17/08/21

21/08/21

SAR ID NNG-A08

Pile 1

Pile 2

Pile 3

Actual Easting

544167.02

544141.04

544167.00

Actual Northing

6231671.04

6231656.06

6231641.04

Casing stick-up above seabed (m)

0.37

0.20

0.37

Date Casing Installed

05/10/20

03/10/20

07/10/20

Pile stick-up above seabed (m)

2.72

1.68

1.71

Date Pile Installed

20/07/22

20/07/22

20/07/22

SAR ID NNG-H13

Pile 1

Pile 2

Pile 3

Actual Easting


-

549536.13

Actual Northing

-

-

6238282.73

Casing stick-up above seabed (m)

N/A

N/A

BML

Date Casing Installed

-

-

21/10/20

Pile stick-up above seabed (m)

-

-

-

Date Pile Installed

-

-

-

SAR ID NNG-G10

Pile 1

Pile 2

Pile 3

Actual Easting

549275.70

549249.70

549275.64

Actual Northing

6236423.60

6236408.65

6236393.59

Casing stick-up above seabed (m)

2.24

1.74

BML

Date Casing Installed

05/11/20

28/10/20

11/11/20

Pile stick-up above seabed (m)

-

-

-

Date Pile Installed

-

-

-

SAR ID NNG-F08

Pile 1

Pile 2

Pile 3

Actual Easting

548952.44

548926.61

548952.70

Actual Northing

6234568.15

6234552.93

6234538.15

Casing stick-up above seabed (m)

1.71

1.61

1.55

Date Casing Installed

14/11/20

24/11/20

20/11/20

Pile stick-up above seabed (m)

4.90

3.71

3.74

Date Pile Installed

13/12/21

14/12/21

14/12/21

SAR ID NNG-F22

Pile 1

Pile 2

Pile 3

Actual Easting

544821.40

544795.45

544821.44

Actual Northing

6241175.95

6241160.92

6241145.94

Casing stick-up above seabed (m)

0.94

1.18

1.17

Date Casing Installed

27/11/20

29/11/20

28/11/20

Pile stick-up above seabed (m)

5.12

4.38

4.36

Date Pile Installed

09/04/22

09/04/22

09/04/22

SAR ID NNG-H15

Pile 1

Pile 2

Pile 3

Actual Easting

549041.96

549016.17

549042.31

Actual Northing

6239168.18

6239152.88

6239138.18

Casing stick-up above seabed (m)

1.58

1.14

1.42

Date Casing Installed

03/12/20

07/12/20

01/12/20

Pile stick-up above seabed (m)

4.76

3.44

3.91

Date Pile Installed

05/03/22

05/03/22

06/03/22

SAR ID NNG-H21

Pile 1

Pile 2

Pile 3

Actual Easting

547570.42

547544.54

547570.60

Actual Northing

6241684.82

6241669.67

6241654.81

Casing stick-up above seabed (m)

1.12

1.19

0.99

Date Casing Installed

13/12/20

15/12/20

10/12/20

Pile stick-up above seabed (m)

3.057

2.037

2.307

Date Pile Installed

09/11/21

09/11/21

09/11/21

SAR ID NNG-F19

Pile 1

Pile 2

Pile 3

Actual Easting

545922.39

545896.47

545922.48

Actual Northing

6239413.32

6239398.26

6239383.32

Casing stick-up above seabed (m)

1.28

0.98

1.31

Date Casing Installed

20/12/20

22/12/20

21/12/20

Pile stick-up above seabed (m)

3.86

2.43

2.77

Date Pile Installed

03/06/23

03/06/23

03/06/23

SAR ID NNG-A19

Pile 1

Pile 2

Pile 3

Actual Easting

541275.86

541250.00

541276.08

Actual Northing

6236882.95

6236867.76

6236852.94

Casing stick-up above seabed (m)

1.27

1.07

1.47

Date Casing Installed

27/12/20

26/12/20

28/12/20

Pile stick-up above seabed (m)

3.91

2.72

3.18

Date Pile Installed

15/03/22

15/03/22

15/03/22

SAR ID NNG-B22

Pile 1

Pile 2

Pile 3

Actual Easting

541352.30

541326.63

541352.87

Actual Northing

6238985.97

6238970.49

6238955.98

Casing stick-up above seabed (m)

1.03

1.33

1.17

Date Casing Installed

02/01/21

05/01/21

31/12/20

Pile stick-up above seabed (m)

3.877

2.783

2.868

Date Pile Installed

16/11/21

15/11/21

15/11/21

SAR ID NNG-B11

Pile 1

Pile 2

Pile 3

Actual Easting

544062.73

544037.17

544063.52

Actual Northing

6234125.97

6234110.26

6234095.98

Casing stick-up above seabed (m)

1.47

1.54

1.17

Date Casing Installed

28/01/21

27/01/21

26/01/21

Pile stick-up above seabed (m)

3.700

2.841

2.316

Date Pile Installed

23/11/21

22/11/21

23/11/21

SAR ID NNG-C19

Pile 1

Pile 2

Pile 3

Actual Easting

543040.62

543014.88

543041.05

Actual Northing

6238135.24

6238119.87

6238105.23

Casing stick-up above seabed (m)

0.41

0.52

0.36

Date Casing Installed

13/01/2021

14/01/21

12/01/21

Pile stick-up above seabed (m)

3.74

2.91

2.81

Date Pile Installed

11/01/2022

11/01/2022

11/01/2022

SAR ID NNG-F05

Pile 1

Pile 2

Pile 3

Actual Easting

549973.67

549947.85

549974.00

Actual Northing

6232968.99

6232953.70

6232938.99

Casing stick-up above seabed (m)

1.14

1.22

1.23

Date Casing Installed

16/02/2021

17/02/2021

19/02/2021

Pile stick-up above seabed (m)

4.96

4.02

4.04

Date Pile Installed

22/03/2022

22/03/2022

22/03/2022

SAR ID NNG-A09

Pile 1

Pile 2

Pile 3

Actual Easting

543559.504

543533.575

543559.622

Actual Northing

6232570.395

6232555.259

6232540.395

Casing stick-up above seabed (m)

1.25

1.47

1.15

Date Casing Installed

02/03/2021

04/03/2021

03/03/2021

Pile stick-up above seabed (m)

3.93

3.24

2.83

Date Pile Installed

02/04/22

02/04/22

03/04/22

SAR ID NNG-E02

Pile 1

Pile 2

Pile 3

Actual Easting

550400.091

550374.422

550400.658

Actual Northing

6230190.433

6230174.933

6230160.425

Casing stick-up above seabed (m)

1.18

1.18

1.18

Date Casing Installed

26/02/2021

25/02/2021

22/02/2021

Pile stick-up above seabed (m)

4.00

3.12

3.06

Date Pile Installed

16/08/2022

16/08/2022

16/08/2022

SAR ID NNG-B08

Pile 1

Pile 2

Pile 3

Actual Easting

545089.01

545063.4

545089.69

Actual Northing

6232504.83

6232489.23

6232474.84

Casing stick-up above seabed (m)

1.14

1.04

1.09

Date Casing Installed

08/03/21

06/03/21

09/03/21

Pile stick-up above seabed (m)

4.15

3.09

3.14

Date Pile Installed

28/02/22

28/02/22

28/02/22

SAR ID NNG-G12

Pile 1

Pile 2

Pile 3

Actual Easting

548806.57

548780.65

548806.65

Actual Northing

6237240.77

6237225.69

6237210.72

Casing stick-up above seabed (m)

1.11

1.00

1.09

Date Casing Installed

28/03/21

27/03/21

29/03/21

Pile stick-up above seabed (m)

4.51

3.11

3.05

Date Pile Installed

19/04/22

19/04/22

19/04/22

SAR ID NNG-D03

Pile 1

Pile 2

Pile 3

Actual Easting

549190.3

549164.29

549190.24

Actual Northing

6230173.29

6230158.41

6230143.31

Casing stick-up above seabed (m)

1.21

1.13

1.10

Date Casing Installed

19/03/21

17/03/21

13/03/21

Pile stick-up above seabed (m)

3.62

2.72

2.46

Date Pile Installed

16/06/22

16/06/22

16.06.22

SAR ID NNG- H09

Pile 1

Pile 2

Pile 3

Actual Easting

550556.20

550530.48

550556.72

Actual Northing

6236562.33

6236546.85

6236532.29

Casing stick-up above seabed (m)

0.94

1.14

1.15

Date Casing Installed

02/04/21

31/03/21

03/04/21

Pile stick-up above seabed (m)

3.37

2.54

2.58

Date Pile Installed

07/02/2022

07/02/2022

07/02/2022

SAR ID NNG-H11

Pile 1

Pile 2

Pile 3

Actual Easting

550043.544

550017.628

550043.618

Actual Northing

6237440.429

6237425.386

6237410.45

Casing stick-up above seabed (m)

1.019

1.155

1.544

Date Casing Installed

13/04/2021

14/04/2021

11/04/2021

Pile stick-up above seabed (m)

3.31

2.51

2.82

Date Pile Installed

23/06/2022

23/06/2022

23/06/2022

SAR ID NNG- C07

Pile 1

Pile 2

Pile 3

Actual Easting

546482.447

546456.363

546482.248

Actual Northing

6232458.087

6232443.272

6232428.107

Casing stick-up above seabed (m)

1.336

1.029

1.269

Date Casing Installed

16/04/2021

19/04/2021

17/04/2021

Pile stick-up above seabed (m)

2.90

3.62

2.79

Date Pile Installed

10/07/22

10/07/22

10/07/22

SAR ID NNG- E16

Pile 1

Pile 2

Pile 3

Actual Easting

545764.652

545738.677

545764.575

Actual Northing

6237639.754

6237624.794

6237609.74

Casing stick-up above seabed (m)

1.35

1.43

1.18

Date Casing Installed

22/04/2021

25/04/2021

23/04/2021

Pile stick-up above seabed (m)

2.95

4.04

2.74

Date Pile Installed

30/06/22

30/06/22

30/06/22

SAR ID NNG- OSS-N

Pile 1

Pile 2

Pile 3

Actual Easting

546253.18

546227.59

546253.937

Actual Northing

6236852.27

6236836.58

6236822.25

Casing stick-up above seabed (m)

1.36

1.24

1.18

Date Casing Installed

07/05/21

13/05/21

10/05/21

Pile stick-up above seabed (m)

4.018

3.054

2.685

Date Pile Installed

08/09/21

08/09/21

06/09/21

SAR ID NNG- OSS-S

Pile 1

Pile 2

Pile 3

Actual Easting

547114.35

547088.59

547114.73

Actual Northing

6233465.08

6233449.74

6233435.05

Casing stick-up above seabed (m)

1.12

1.20

1.09

Date Casing Installed

16/05/21

17/05/21

18/05/21

Pile stick-up above seabed (m)

3.927

3.308

2.875

Date Pile Installed

01/09/21

01/09/21

01/09/21

SAR ID NNG-C18

Pile 1

Pile 2

Pile 3

Actual Easting

543470.368

543445.744

543472.853

Actual Northing

6237341.236

6237324.133

6237311.287

Casing stick-up above seabed (m)

0.898

1.116

1.063

Date Casing Installed

26/05/2021

25/05/2021

24/05/2021

Pile stick-up above seabed (m)

1.90

3.10

1.99

Date Pile Installed

18/02/2022

19/02/2022

18/02/2022

SAR ID NNG-F17

Pile 1

Pile 2

Pile 3

Actual Easting

546455.67

546429.80

546455.92

Actual Northing

6238612.87

6238597.71

6238582.88

Casing stick-up above seabed (m)

0.81

1.92

1.15

Date Casing Installed

22/01/2021

20/01/2021

24/01/2021

Pile stick-up above seabed (m)

3.62

3.32

2.85

Date Pile Installed

22/01/2022

17/01/2022

16/01/2022

SAR ID NNG-G07

Pile 1

Pile 2

Pile 3

Actual Easting

550216.04

550190.01

550215.91

Actual Northing

6234733.03

6234718.17

6234703.02

Casing stick-up above seabed (m)

1.27

0.78

1.37

Date Casing Installed

31/01/21

02/02/21

10/02/21

Pile stick-up above seabed (m)

3.85

2.53

2.94

Date Pile Installed

17/12/21

18/12/21

19/12/21

SAR ID NNG-H08

Pile 1

Pile 2

Pile 3

Actual Easting

6235723.71

6235708.03

6235693.71

Actual Northing

551053.11

551027.55

551053.90

Casing stick-up above seabed (m)

1.21

1.49

1.41

Date Casing Installed

09/10/22

12/10/22

12/10/22

Pile stick-up above seabed (m)

3.91

2.91

3.22

Date Pile Installed

05/12/22

05/12/22

05/12/22

SAR ID NNG-G02

Pile 1

Pile 2

Pile 3

Actual Easting

552118.93

552092.96

552118.91

Actual Northing

6231492.88

6231477.91

6231462.88

Casing stick-up above seabed (m)

1.09

1.41

1.23

Date Casing Installed

25/06/22

0/07/22

12/07/22

Pile stick-up above seabed (m)

3.05

4.24

3.03

Date Pile Installed

01/09/23

01/09/23

01/09/23

SAR ID NNG-G04

Pile 1

Pile 2

Pile 3

Actual Easting

551182.54

551156.21

551181.75

Actual Northing

6233106.90

6233092.58

6233076.92

Casing stick-up above seabed (m)

0.98

0.92

1.14

Date Casing Installed

19/07/22

21/07/22

24/07/22

Pile stick-up above seabed (m)

3.31

4.15

3.49

Date Pile Installed

28/11/22

28/11/22

28/11/22

SAR ID NNG-F06

Pile 1

Pile 2

Pile 3

Actual Easting

549452.14

549425.99

549451.73

Actual Northing

6233744.73

6233730.11

6233714.69

Casing stick-up above seabed (m)

1.29

1.29

1.46

Date Casing Installed

31/07/22

04/08/22

05/08/22

Pile stick-up above seabed (m)

3.11

4.06

3.28

Date Pile Installed

21/11/22

21/11/22

21/11/22

SAR ID NNG-E12

Pile 1

Pile 2

Pile 3

Actual Easting

546749.17

546723.67

546750.09

Actual Northing

6236083.30

6236067.57

6236053.35

Casing stick-up above seabed (m)

2.02

1.25

1.72

Date Casing Installed

16/10/22

20/10/22

25/10/22

Pile stick-up above seabed (m)

3.36

3.66

2.93

Date Pile Installed

10/12/22

09/12/22

10/12/22

SAR ID NNG-H06

Pile 1

Pile 2

Pile 3

Actual Easting

551556.78

551530.80

551556.78

Actual Northing

6234831.88

6234816.88

6234801.88

Casing stick-up above seabed (m)

1.23

1.32

1.16

Date Casing Installed

07/11/22

04/11/22

06/11/22

Pile stick-up above seabed (m)

2.76

3.88

2.72

Date Pile Installed

22/12/22

21/12/22

22/12/22

SAR ID NNG-C14

Pile 1

Pile 2

Pile 3

Actual Easting

544416.61

544390.62

544416.57

Actual Northing

6235741.33

6235726.37

6235711.33

Casing stick-up above seabed (m)

1.38

1.37

1.22

Date Casing Installed

15/12/22

15/12/22

15/12/22

Pile stick-up above seabed (m)

3.45

4.34

3.06

Date Pile Installed

25/12/22

25/12/22

25/12/22

SAR ID NNG-E18

Pile 1

Pile 2

Pile 3

Actual Easting

545276.73

545250.84

545276.88

Actual Northing

6238470.53

6238455.40

6238440.52

Casing stick-up above seabed (m)

1.14

1.13

1.10

Date Casing Installed

01/01/23

05/01/23

05/01/23

Pile stick-up above seabed (m)

4.01

3.73

3.27

Date Pile Installed

28/01/23

28/01/23

28/01/23

SAR ID NNG-H22

Pile 1

Pile 2

Pile 3

Actual Easting

547090.383

547064.49

547090.57

Actual Northing

6242503.31

6242488.12

6242473.33

Casing stick-up above seabed (m)

1.09

1.14

1.07

Date Casing Installed

21/01/23

20/01/23

13/01/23

Pile stick-up above seabed (m)

2.99

4.21

2.99

Date Pile Installed

15/03/23

15/03/23

15/03/23

SAR ID NNG-G21

Pile 1

Pile 2

Pile 3

Actual Easting

546415.84

546389.47

546415.07

Actual Northing

6241355.45

6241341.15

6241325.47

Casing stick-up above seabed (m)

1.54

1.24

1.15

Date Casing Installed

03/02/23

05/02/23

01/02/23

Pile stick-up above seabed (m)

4.37

6.03

4.35

Date Pile Installed

04/04/23

04/04/23

04/04/23

SAR ID NNG-B20

Pile 1

Pile 2

Pile 3

Actual Easting

541774.09

541747.84

541773.68

Actual Northing

6238013.88

6237999.23

6237983.91

Casing stick-up above seabed (m)

1.92

2.81

1.43

Date Casing Installed

07/03/23

08/03/23

10/03/23

Pile stick-up above seabed (m)

7.45

4.37

3.02

Date Pile Installed

07/04/23

07/04/23

07/04/23

SAR ID NNG-D13

Pile 1

Pile 2

Pile 3

Actual Easting

545588.59

545562.30

545587.91

Actual Northing

6235918.44

6235904.04

6235888.44

Casing stick-up above seabed (m)

1.37

1.38

1.23

Date Casing Installed

08/04/23

14/04/23

14/04/23

Pile stick-up above seabed (m)

2.74

3.56

2.42

Date Pile Installed

27/04/23

26/04/23

26/04/23

SAR ID NNG-D06

Pile 1

Pile 2

Pile 3

Actual Easting

547641.41

547615.40

547641.41

Actual Northing

6232662.43

6232647.41

6232632.44

Casing stick-up above seabed (m)

1.30

1.30

1.85

Date Casing Installed

10/05/23

10/05/23

10/05/23

Pile stick-up above seabed (m)

5.00

3.95

4.15

Date Pile Installed

19/05/23

19/05/23

19/05/23

SAR ID NNG-A11

Pile 1

Pile 2

Pile 3

Actual Easting

542885.47

542859.47

542885.48

Actual Northing

6233518.32

6233503.29

6233488.28

Casing stick-up above seabed (m)

1.57

2.27

0.86

Date Casing Installed

14/05/23

12/05/23

15/05/23

Pile stick-up above seabed (m)

3.26

2.95

1.82

Date Pile Installed

23/06/23

29/06/23

28/06/23

SAR ID NNG-G10

Pile 1

Pile 2

Pile 3

Actual Easting

549284.18

549258.49

549284.72

Actual Northing

6236409.55

6236394.13

6236379.58

Casing stick-up above seabed (m)

1.53

1.22

1.53

Date Casing Installed

02/06/23

04/06/23

31/05/23

Pile stick-up above seabed (m)

3.09

3.79

3.01

Date Pile Installed

15/06/23

15/06/23

15/06/23

SAR ID NNG-H13

Pile 1

Pile 2

Pile 3

Actual Easting

549514.80

549488.93

549514.97

Actual Northing

6238319.03

6238303.89

6238289.06

Casing stick-up above seabed (m)

1.93

161

1.85

Date Casing Installed

26/05/23

24/05/23

28/05/23

Pile stick-up above seabed (m)

3.91

4.76

3.92

Date Pile Installed

24/06/23

24/06/23

24/06/23

SAR ID NNG-A05

Pile 1

Pile 2

Pile 3

Actual Easting

545253.35

545227.52

545253.64

Actual Northing

6230117.19

6230101.93

6230087.20

Casing stick-up above seabed (m)

0.92

1.39

1.11

Date Casing Installed

08/06/23

09/06/23

07/06/23

Pile stick-up above seabed (m)

3.06

2.57

2.31

Date Pile Installed

09/07/23

09/07/23

09/07/23

SAR ID NNG-H23

Pile 1

Pile 2

Pile 3

Actual Easting

546581.51

546555.76

546581.87

Actual Northing

6243344.34

6243329.03

6243314.33

Casing stick-up above seabed (m)

1.59

1.40

1.50

Date Casing Installed

13/06/23

18/06/23

16/06/23

Pile stick-up above seabed (m)

3.94

4.83

3.77

Date Pile Installed

30/07/23

30/07/23

30/07/23

SAR ID NNG-D23

Pile 1

Pile 2

Pile 3

Actual Easting

542629.33

542603.62

542629.81

Actual Northing

6240759.33

6240743.95

6240729.34

Casing stick-up above seabed (m)

1.65

1.61

1.55

Date Casing Installed

26/06/23

29/06/23

23/06/23

Pile stick-up above seabed (m)

4.19

4.78

3.70

Date Pile Installed

21/07/23

21/07/23

21/07/23

SAR ID NNG-A13

Pile 1

Pile 2

Pile 3

Actual Easting

542781.88

542755.84

542781.69

Actual Northing

6234418.49

6234403.66

6234388.47

Casing stick-up above seabed (m)

1.43

1.43

1.27

Date Casing Installed

19/07/23

21/07/23

14/07/23

Pile stick-up above seabed (m)

3.25

4.55

3.11

Date Pile Installed

15/09/23

15/09/23

15/09/23

SAR ID NNG-G14

Pile 1

Pile 2

Pile 3

Actual Easting

548315.68

548290.00

548316.23

Actual Northing

6238080.18

6238064.68

6238050.16

Casing stick-up above seabed (m)

0.97

1.10

1.20

Date Casing Installed

07/07/23

10/07/23

05/07/23

Pile stick-up above seabed (m)

2.47

3.32

1.56

Date Pile Installed

11/08/23

11/08/23

11/08/23

SAR ID NNG-D05

Pile 1

Pile 2

Pile 3

Actual Easting

548143.62

548117.90

548144.09

Actual Northing

6231860.20

6231844.77

6231830.17

Casing stick-up above seabed (m)

1.45

0.98

1.06

Date Casing Installed

29/07/23

02/08/23

27/07/23

Pile stick-up above seabed (m)

2.48

2.86

2.13

Date Pile Installed

27/09/23

27/09/23

27/09/23

SAR ID NNG-H19

Pile 1

Pile 2

Pile 3

Actual Easting

548061.67

548035.65

548061.99

Actual Northing

6240845.81

6240830.57

6240815.84

Casing stick-up above seabed (m)

1.35

1.51

1.6

Date Casing Installed

06/08/23

08/08/23

05/08/23

Pile stick-up above seabed (m)

2.76

3.91

3.05

Date Pile Installed

22/09/23

22/09/23

22/09/23

SAR ID NNG-H17

Pile 1

Pile 2

Pile 3

Actual Easting

548551.14

548525.58

548551.93

Actual Northing

6239980.33

6239964.66

6239950.37

Casing stick-up above seabed (m)

1.10

1.14

1.01

Date Casing Installed

28/05/21

14/08/23

12/08/23

Pile stick-up above seabed (m)

2.86

3.46

2.42

Date Pile Installed

06/09/23

06/09/23

06/09/23

SAR ID NNG-B04

Pile 1

Pile 2

Pile 3

Actual Easting

546563.32

546536.37

546561.25

Actual Northing

6230124.69

6230111.50

6230094.75

Casing stick-up above seabed (m)

1.20

1.43

1.34

Date Casing Installed

22/08/23

20/08/23

25/08/23

Pile stick-up above seabed (m)

2.67

3.86

2.65

Date Pile Installed

12/09/23

12/09/23

12/09/23

Last update conducted:  3rd October 2023

Key Contact Information

We are committed keeping you updated during the construction of the Neart na Gaoithe Offshore Wind Farm.
There are two easy ways to contact our team.
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Please see our Privacy Policy for more info.​